Tracing the Route of Uganda’s Crude Oil Pipeline Top story

Comments 674 Views Kampala, Uganda
Top Soil Removal On The Crude Oil Pipeline Right Of Way During Pipeline Construction. The EACOP Is NOt Yet Being Constructed

Top Soil Removal On The Crude Oil Pipeline Right Of Way During Pipeline Construction. The EACOP Is NOt Yet Being Constructed

In short
From Hoima District, the corridor passes in between Wambabya and Bugoma Forest Reserves through a modified section of Taala Forest Reserve in Kyankwanzi District, heading in the South easterly direction near the eastern border of Kasana - Kasambya Forest Reserve in Mubende District.

 

IP: 3.233.217.242. Referrer: . FirstClickFree: 0. Clicks by IP: ?. Clicks by cookie: ?.