Stalled Bridge Works Irk Kyotera Residents Top story

Comments 1523 Views Kyotera, Uganda
Stalled Bridge Davis Buyondo

Stalled Bridge Login to license this image from 1$.

In short
Annet Nabaggala, the Kyotera District Engineer, Rakai is meant to complete the bridge and officially hand it over to Kyotera. She however, says the construction work stalled mysteriously paralyzing transport in the area.

 

IP: 3.235.101.141. Referrer: . FirstClickFree: 0. Clicks by IP: ?. Clicks by cookie: ?.