President Wants Joint Ventures for Infrastructure Projects Top story

Comments 429 Views Jinja, Uganda
H.E. Yoweri Museveni, commissions the source of the Nile bridge. Wambuzi Reacheal

H.E. Yoweri Museveni, commissions the source of the Nile bridge. Login to license this image from 1$.

In short
The bridge, the longest across a river in East Africa, at 8 meters high, was funded through a loan from Japanese International Cooperation Agency JICA and constructed by Zenitaka Corporation Company. It becomes the second gateway to the Eastern part of Uganda after the Owen Falls Bridge which has exceeded its lifespan.

 

IP: 54.221.9.6. Referrer: . FirstClickFree: 0. Clicks by IP: ?. Clicks by cookie: ?.