KCCA Set to Expand Lubigi, Nakamiro Drainage Channels

Comments 230 Views
Part of the unlined Lubigi Drainage Channel in Bwaise

Part of the unlined Lubigi Drainage Channel in Bwaise

In short
Works at Lubigi will include leveling within the channel and lining. KCCA plans to use concrete cable lining where concrete blocks are joined together using cables. This Baagala says is a flexible technology that eases excavation works during maintanance. Linning reduces the streams roughness, which in effect quickens the flow of water through the stream channel.

 

IP: 3.234.210.89. Referrer: . FirstClickFree: 0. Clicks by IP: ?. Clicks by cookie: ?.